References
[1].L.R.Goel and S.Z.Mumtaz,"Analysis of a two
server two unit cold standby system with correlated failures and
repairs",Microelectron Reliability ,34(4),1994,pp 731-734.
[2].M.N.Gopalan and K.S.Bhanu,"Cost analysis of a
two unit repairable system subject to online preventive
maintanence and/or repair",Microelectron Reliability ,35,1995,pp 251-258.
[3].A.Kumar ,S.K.Gupta and
G.Taneja,"Comperative study of the profit of a two server
system including patience time and instruction time",Microelectron Reliability ,36(10),1996,pp 1595-1601.
[4].M.N.Gopalan and U.Dineshkumar,"on the
transient behaviour of a repairable system with a warm
standby",Microelectron Reliability ,36,1996,pp 525-532
[5].M.Jacob,S.Narmada and T.Varghese," two unit
deteriorating standby system with repair",Microelectron
Reliability ,37(5),1997,pp 857-862.
[6].W.L.Attahiru Sule Alfa and
Y.Q.Zhao,"Stochastic analysis of a repairable system with three units and repair facilities",Microelectron Reliability ,38(4),1998,pp 585-595.
[7].S.M.Rizwan and Gulshan Taneja ,"profit analysis
of a system with perfect repair at partial failure or complete
failure",pure&Applied Mathematika sciences ,Lll,2000,pp 7-14.
[8].Gulshan Taneja and Naveen Vandana,
"comparative study of two reliability models with patience time
and chances of non-availability of expert repairman",pure and
applied Mathematika Sciences,LVll,2003,pp 23-35.
[9].W.Kuo and M.J.Zuo ,optimal reliabilty modelling
,John Wiley ,2003.
[10].S.M.Rizwan ,V.Khurana and G.Taneja
"Modelling and optimization of a single -unit PLC
system",International Journal of Modelling and Simulation ,27
(4),2007,pp 361-368.