References
[1]. P. M. Rojasra et al., (2013). "Performance Improvement
Through 5S in Small Scale Industry: A case study"
International Journal of Modern Engineering Research.
Vol.3, Issue.3, pp-1654-1660.
[2]. Bhasin & burcher, "Lean Viewed as a Philosophy"
Journal of Manufacturing Technology Management,
17(1), pp.56-72.
[3]. Denish B.Modi et al., (2014). "Lean Thinking: Reduction
of Waste, Lead Time, Cost Through Lean Manufacturing
Tools And Technique". International Journal of Emerging Technology and Advanced Engineering, Vol.4, Issue 3.
[4]. J. Michalska et al., (2007). "The 5S Methodology as a
Tool for Improving the Organisation". Journal of
Achievement in Material and Manufacturing Engineering,
Vol.24 Issue 2.
[5]. Liker, J K and Hoseus, M. Toyota culture: the heart and
soul of the Toyota way, New York: McGraw-Hill.
[6]. Jose H. Ablanedo-Rosas at al., (2010). "Quality
improvement supported by the 5S, an empirical case study
of Mexican organizations". International Journal Of
Production Research, Vol. 48 No. 23, 1, pp.7063-7087.
[7]. Chitre, Ameya R., (2010). "Implementing the 5S
Methodology for Lab Management in the Quality
Assurance Lab of Flexible Packaging Converter". MS
Technology Management, Graduate School University of
Wisconsin-Stout.
[8]. Chauhan et al., (2010). "Measuring the Status of Lean
Manufacturing Using AHP". International Journal of
Emerging Technology. Vol. 1 No.2, pp.115-120.
[9]. Hudli and Imandar, (2020). "Areas of Lean
Manufacturing for Productivity Improvement in a
Manufacturing Unity". World Academy of Science, Engineering and Technology, Vol. 69.
[10]. S. B. Khedkar et al., (2012). "Study of implementing 5S
Technique in Plastic Moulding", International Journal of
Modern Engineering Research, Vol.2, Issue.5, pp-3653-
3656, ISSN: 2249-6645.
[11]. Parshant Koli et al., (2012). "General Implementation
and Calculation of 5S Activity in any organization"
International Journal of Science and Research. India
Online ISSN: 2319-7064, Vol. 1, Issue.3.
[12]. Septika Rosiana Dewi et al. "5S Program to Reduce
Change-Over Time on Forming Department (Case Study
on CV Piranti Works Temanggung)". IOP Conf. Ser: Mater.
Sci. Eng,. 46 012040 doi:10.1088/1757-899X/46/1/012040.
[13]. Laura Macchion et al., (2013). "Lean Thinking to Provide
Smart Infrastructure". Department of Management &
Engineering, University of Padua, Stradella San Nicola, 3-
36100 Vicenza, Italy.
[14]. Balwinder Singh Sidhu et al., (2013). "The "5S" Strategy
by Using PDCA Cycle for Continuous Improvement of the
Manufacturing Processes in Agriculture Industr y"
International Journal of Advanced Scientific and Technical
Research, ISSN 2249-9954, Issue 3, Vol.5.