References
[1]. Ahmad, I., & Kwok, Y.-K. (1994). A New Approach to Scheduling Parallel Programs Using Task Duplication. Parallel Processing, 1994. ICPP 1994 International Conference on (Vol. 2, pp. 47-51).
[2]. Boeres, C., Filho, J. V., & Rebello, V. E. F. (2004). A cluster- based strategy for scheduling task on heterogeneous processors. In Proceedings - Symposium on Computer Architecture and High Performance Computing (pp. 214-221).
[3]. Fan, C., Deng, H., Wang, F., Wei, S., Dai, W., & Liang, B. (2015). A Sur vey on Task Scheduling Method in Heterogeneous Computing System. 2015 8th International Conference on Intelligent Networks and Intelligent Systems (ICINIS) (Vol. 1, pp. 90-93).
[4]. Hagras, T., & Janeček, J. (2004). A near lower-bound complexity algorithm for compile-time task-scheduling in heterogeneous computing systems. In Proceedings - ISPDC 2004: Third International Symposium on Parallel and Distributed Computing/HeteroPar '04: Third International Workshop on Algorithms, Models and Tools for Parallel Computing on Heterogeneous Networks (pp. 106-113).
[5]. Kafil, M., & Ahmad, I. (1998). Optimal task assignment in heterogeneous distributed computing systems. IEEE Concurrency, 6(3), 42-50.
[6]. Liu, C.-H., Li, C.-F., Lai, K.-C., & Wu, C.-C. (2006). A dynamic critical path duplication task scheduling algorithm for distributed heterogeneous computing systems. In 12th International Conference on Parallel and Distributed Systems, 2006. (ICPADS) 2006 (Vol. 1, p. 8).
[7]. Omara, F. A., & Arafa, M. M. (2010). Genetic algorithms for task scheduling problem. Journal of Parallel and Distributed Computing, 70(1), 13-22.
[8]. Page, A. J., & Naughton, T. J. (2005). Dynamic Task Scheduling using Genetic Algorithms for Heterogeneous Distributed Computing. Parallel and Distributed Processing Symposium, 2005. Proceedings. 19th IEEE International.
[9]. Tiwari, P. K., & Vidyarthi, D. P. (2016). Improved auto control ant colony optimization using lazy ant approach for grid scheduling problem. Future Generation Computer Systems, 60, 78-89.
[10]. Topcuoglu, H., Hariri, S., & Wu, M. (2002). Performance-effective and low-complexity task scheduling for heterogeneous computing. Parallel and Distributed Systems, 13(3), 260-274.
[11]. Tripathy, B., Dash, S., & Padhy, S. K. (2015a). Dynamic task scheduling using a directed neural network. Journal of Parallel and Distributed Computing, 75, 101-106.
[12]. Tripathy, B., Dash, S., & Padhy, S. K. (2015b). Multiprocessor scheduling and neural network training methods using shuffled frog-leaping algorithm. Computers & Industrial Engineering, 80, 154-158.
[13]. Visalakshi, P., & Sivanandam, S. N. (2009). Dynamic task scheduling with load balancing using hybrid particle swarm optimization. Int. J. Open Problems Compt. Math, 2(3), 475-488.