References
[1]. Gopalan, M. N., & Bhanu, K. S. (1995). Cost analysis of a two unit repairable system subject to on-line preventive
maintenance and/or repair. Microelectronics Reliability, 35(2), 251-258.
[2]. Gupta, S., & Gupta, S. K. (2013). Stochastic analysis of a reliability model of one-unit system with post inspection, post
repair, preventive maintenance and replacement. International Journal of Mechanical Engineering and Robotics
Research, 2(2), 178-188.
[3]. Malhotra, R., & Taneja, G. (2014). Stochastic analysis of a two-unit cold standby system wherein both units may become
operative depending upon the demand. Journal of Quality and Reliability Engineering, 2014. DOI:10.1155/2014/896379
[4]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P. (2009). MTSF and availability of a two unit CC Plant.
Proceedings of the International Conference on Modeling, Simulation and Applied Optimization, (pp. 1-5), American
University, Sharjah, UAE.
[5]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., & Ramachandran, K. P. (2011). Reliability modelling and analysis of a two
unit continuous casting plant. Journal of the Franklin Institute, 348(7), 1488-1505.
[6]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P., & Taneja, G. (2009). Optimization of a single unit
CC plant with scheduled maintenance policy. Proceedings of the International Conference on Recent Advances in
Material Processing Technology, (pp. 609-613), India.
[7]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P., & Taneja, G. (2009). Profit evaluation of a single
unit cc plant with scheduled maintenance. Caledonian Journal of Engineering, 5(1), 25-33.
[8]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P., & Taneja, G. (2010). Reliability modeling and
analysis of a two unit parallel CC plant with different installed capacities. J. Manuf. Engg, 5(3), 197-204.
[9]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P., & Taneja, G. (2010, October). Comparative
Analysis between Profits of the Two Models of a CC Plant. Proceedings of the International Conference on Modeling,
Optimization and Computing, National Institute of Technology, Durgapur, India, (Vol. 1298, No. 1, pp. 226-231). AIP.
[10]. Mathew, A. G., Rizwan, S. M., Majumder, M. C., Ramachandran, K. P., & Taneja, G. (2011). Reliability Analysis of
Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity. International Journal of Performability
Engineering, 7(2), 179-185.
[11]. Naithani, A., Parashar, B., Bhatia, P. K., & Taneja, G. (2017). Probabilistic analysis of a 3-unit induced draft fan system
with one warm standby with priority to repair of the unit in working state. International Journal of System Assurance
Engineering and Management, 1-9. DOI:10.1007/s13198-017-0608-6
[12]. Niwas, R., Kadyan, M. S., & Kumar, J. (2016). MTSF (Mean Time to System Failure) and profit analysis of a single-unit
system with inspection for feasibility of repair beyond warranty. International Journal of System Assurance Engineering and
Management, 7(1), 198-204.
[13]. Padmavathi, N., Rizwan, S. M., Pal, A., & Taneja, G. (2012). Reliability analysis of an evaporator of a desalination plant
with online repair and emergency shutdowns. Aryabhatta Journal of Mathematics and Informatics, 4(1), 1-11.
[14]. Padmavathi, N., Rizwan, S. M., Pal, A., & Taneja, G. (2013). Comparative analysis of the two models of an evaporator of
a desalination plant. Proceedings of International Conference on Information and Mathematical Science, Punjab, India,
418-422.
[15]. Padmavathi, N., Rizwan, S. M., Pal, A., & Taneja, G. (2013). Probabilistic Analysis of an Evaporator of a Desalination Plant
with Priority for Repair Over Maintenance, International Journal of Scientific and Statistical Computing, 4(1), 1-8.
[16]. Padmavathi, N., Rizwan, S. M., Pal, A., & Taneja, G. (2014). Probabilistic Analysis of a Desalination Plant with Major and
Minor Failures and Shutdown During Winter Season. International Journal of Scientific and Statistical Computing, 5(1), 15-23.
[17]. Padmavathi, N., Rizwan, S. M., Pal, A., & Taneja, G. (2014). Probabilistic analysis of a seven unit desalination plant with
minor/major failures and priority given to repair over maintenance. Aryabhatta Journal of Mathematics and Informatics,
6(1), 219-230.
[18]. Padmavathi, N., Rizwan, S. M., & Senguttuvan, A. (2015). Comparative Analysis between the Reliability Models
Portraying Two Operating Conditions of a Desalination Plant, International Journal of Core Engineering and Management,
1(12), 1-10.
[19]. Ram, M., Singh, S. B., & Singh, V. V. (2013). Stochastic analysis of a standby system with waiting repair strategy. IEEE Transactions on Systems, man, and cybernetics: Systems, 43(3), 698-707.
[20]. Rizwan, S. M. (2007). Reliability analysis of a two unit system with two repairmen. Caledonian Journal of Engineering,
3(2), 1-5.
[21]. Rizwan, S. M., Chauhan, H., & Taneja, G. (2005). Stochastic analysis of systems with accident and inspection. Emirates
Journal for Engineering Research, 10(2), 81-88.
[22]. Rizwan, S. M., Khurana, V., & Taneja, G. (2005). Reliability modeling of a hot standby PLC system. Proceedings of the
International Conference on Communication, Computer and Power, Sultan Qaboos University, Sultanate of Oman, 486-
489.
[23]. Rizwan, S. M., Khurana, V., & Taneja, G. (2007). Modelling and Optimization of a Single-Unitplc System. International
Journal of Modelling and Simulation, 27(4), 361-368.
[24]. Rizwan, S. M., Khurana, V., & Taneja, G. (2010). Reliability analysis of a hot standby industrial system. International
Journal of Modelling and Simulation, 30(3), 315-322.
[25]. Rizwan, S. M., & Mathew, A. G. (2015). Performance Analysis of Port Cranes. International Journal of Core Engineering
and Management, 2(1), 133-140.
[26]. Rizwan, S. M., Padmavathi, N., Pal, A., & Taneja, G. (2013). Reliability Analysis of a Seven Unit Desalination Plant with
Shutdown During Winter Season and Repair/Maintenance on FCFS Basis. International Journal of Performability Engineering,
9(5), 523-528.
[27]. Rizwan, S. M., Taneja, G., & Tuteja, R. K. (2000). Comparative study between the profits of two models for a two unit
system with rest period of repairman. Journal of Decision and Mathematical Sciences, 5(1-3), 27-44.
[28]. Rizwan, S. M., & Thanikal, J. V. (2014). Reliability Analysis of a Wastewater Treatment Plant with Inspection. i-manager's
Journal on Mathematics, 3(2), 30-35.
[29]. Rizwan, S. M., Thanikal, J. V., Padmavathi, N., & Yazidi, H. (2015). Reliability and Availability Analysis of an Anaerobic
Batch Reactor Treating Fruit and Vegetable Waste. International Journal of Applied Engineering Research, 10(24), 44075-
44079.
[30]. Rizwan, S. M., Thanikal, J. V., & Torrijos, M. (2014). A general model for reliability analysis of a domestic wastewater
treatment plant. International Journal of Condition Monitoring and Diagnostic Engineering Management, 17(3), 3-6.
[31]. Sharma, U., & Kaur, J. (2016). Cost benefit analysis of a compressor standby system with preference of service, repair and
replacement is given to recently failed unit. International Journal of Mathematics Trends and Technology, 30(2), 104-108.
[32]. Taj, S. Z., Rizwan, S. M., Alkali, B. M., Harrison, D. K., & Taneja, G. (2017, April). Reliability modelling and analysis of a
single machine subsystem of a cable plant. 7th International Conference on Modeling, Simulation, and Applied
Optimization, American University, Sharjah, UAE (pp. 1-4). IEEE.
[33]. Taj, S. Z., Rizwan, S. M., Alkali, B. M., Harrison, D. K., & Taneja, G. L. (2017). Reliability Analysis of a Single Machine
Subsystem of a Cable Plant with Six Maintenance Categories. International Journal of Applied Engineering Research, 12(8),
1752-1757.
[34]. Taneja, G., Rizwan, S. M., & Kumar, R. (1992). Profit analysis of a system with perfect repair at partial failure and priority for
repair to complete failed unit. Pure and Applied Mathematika Sciences, 35(1/2), 131-141.
[35]. Tuteja, R. K., Rizwan, S. M., & Taneja, G. (1999). A two server system with regular repairman who is not always available.
National Symposium on Management Science and Statistics - Applications to Trade and Industry, Guru Nanak Dev
University, Amritsar, India, 231-237.
[36]. Tuteja, R. K., Rizwan, S. M., & Taneja, G. (2000). Profit analysis of a system with perfect repair at partial failure or
complete failure. Pure and Applied Mathematika Sciences, 52(1/2), 7-14.
[37]. Tuteja, R. K., Rizwan, S. M., & Taneja, G. (2000). Profit evaluation of a two unit cold stand by system with tiredness and
two types of repairman. Journal of Indian Society of Statistics and Operation Research, 21(1-4), 1-10.