References
[1]. Bensalem A., Turgeon A. (2009). Gestion Optimale
d'un système Hydroélectrique à court terme (Optimal
short term hydro scheduling). In Proceedings of the 1th International
Conference on Renewable Energy'99,
November 23-24, Tlemcen. Algeria.
[2]. Escudero LF, Fuente JL, Garcia C. Prieto FJ. (2008).
Hydropower generation management under uncertainty
via scenario analysis and parallel computation. IEEE Trans
PS 2008; May, Vol 11, N 2 p.683-689.
[3]. Bertsekas D.p. Multiplier Methods A Survey.
Automatica, Pergamon Press, 1976. Printed In Great
Britain, Vol. 12, P. 135-145.
[4]. Turgeon A. Optimal short-term hydro scheduling from
the principle of progressive optimality. Water resources
research, June 81, Vol. 17, No 3, p. 481-486.
[5]. Naresh R. Shatma J (2008). Hydro System Scheduling
Using ANN Approach., IEEE Transactions on Power
Systems. Vol. 15 N 1, Feb, p. 383-395.
[6]. Lecler G (2008). La Programmation Linéaire et ses
Applications en Gestion des Systèmes Hydriques (Linear
programming and their applications for the
management of hydro systems). Conference presented
in workshop: analysis of risk in the management of hydro
systems. Polytechnic of Montréal, November 19-28, 2008.
Montreal.
[7]. Fosso O. B., and Belsnes M.M (2007). Short-term Hydro
Scheduling Liberalized Power System. In: Proceedings of
the International Conference on Power System
Technology Powercon '07, Nov. 21-24, Singapore, pp.
1321-1326.
[8]. Ray W.H., Soleman M.A (2008). The optimal control of
processes containing pure time delays. Eleventh Joint
automatic conference of the America Automatic
Control Council, p. 473-483.
[9]. Sage A.P (2008). Optimum system control. John Wiley
& sons Inc. New York 2008.
[10]. Oh Y.N (2009). An application of the discrete
maximum principle to the most economical powersystem
operation. Electrical Engineering in Japan, 2009, Japan, Vol. 87, pp. 17-29.
[11]. Pierre D., Lowe M.J (2007). Mathematical
Programming via Augmented Lagrangian. Addison
Wesley publishing company.