References
[1]. Goel GD, Murari K. Two unit cold standby redundant
system subject to checking, corrective maintenance and
system replacement with repairable and non repairable
type of failure. Microelectron Reliab 1990; 30 (4): pp. 661-
665.
[2]. Gopalan MN, Muralidhar MN. Cost analysis of a one
unit repairable system subject to online preventive
maintenance and/or repair. Microelectron Reliab 1991;
31(2/3): pp. 223-228.
[3]. Attahiru Sule, Alfa WL, Zhao YQ. Stochastic analysis of
a repairable system with three units and repair facilities.
Microelectron Reliab 1998; 38(4): 585-595.
[4]. Tuteja RK, Rizwan SM, Taneja Gulshan. A two server
system with regular repairman who is not always
available. In: Proc Third Annual Conference of ISITA and
National Symposium on Statistics Department of
Mathematics, Guru Nanak Dev University. Amritsar, 1999,
Feb 12-14.
[5]. Rizwan SM, Taneja Gulshan. Profit analysis of a system
with perfect repair at partial failure or complete failure.
Pure and Applied Mathematica Sciences 2000; LII (1-2):
pp. 7-14.
[6]. Sehgal Archana. Study of some reliability models with
partial failure, Accidents and various types of repair. PhD
Thesis, Department of Statistics, M.D. University, Rohtak,
India, 2000.
[7]. Singh RP, Taneja G, Siwach BS. Two unit warm standby
system with accident and various types of repair. Journal
of Decision and Mathematical Sciences 2000; 5 6 (1- 3): pp. 75-86.
[8]. Kuow, Zuo M J. Optimal reliability modeling. USA: John
Wiley & Sons, Inc., 2003.
[9]. Bhupender Parashar and Gulshan Taneja. Reliability
and profit evaluation of a PLC hot standby system based
on a master-slave concept and two types of repair
facilities, IEEE Transactions on reliability, Vol. 56, No. 3,
2007, pp. 534-539.
[10]. S M Rizwan, Gulshan Taneja, Vipin Khurana and Ahmed Mohiuddin Reliability analysis of a single unit PLC
with inspection, i-manager's Journal on Future
Engineering &Technology, May-July 2008, Vol. 3, No. 4:
pp. 19-26.
[11]. Rizwan S M, Mathew A G, Majumder M C and
Ramachandran K P. Reliability and Availability of a
continuous casting plant, Proceedings of the IEEE
International conference on Industrial Engineering and
Engineering management, 8-12 Dec. 2008, Singapore,
pp. 541-544.