References
[1]. ASTM Standard D5340 (2012). Standard test method for airport pavement condition index surveys.
[2]. ASTM Standard D6433 (2011). Standard practice for
roads and parking lots pavement condition index surveys.
[3]. Friedman, S. (2003). The effect of dynamic decision
making on resource allocation: The case of pavement
management, Dissertation of Ph.D. Program, Worcester
Polytechnic Institute.
[4]. Greene, J., Shahin, M. Y., and Alexander, D. R. (2004).
“Airfield Pavement Condition Assessment”, Transp. Res.
Rec., J. of the TRB, 1889, pp.63–70.
[5]. Haider, S. W., and Dwikat, M. B. (2011). “Estimating
Optimum Timing for Preventive Maintenance Treatment
to Mitigate Pavement Roughness”, Transp. Res. Rec., J. of
the TRB, 2235, pp.43–53.
[6]. Hajj, E. Y., Loria, L., and Sebaaly, P. E. (2011).
“Optimum Time for Application of Slurry Seal to Asphalt
Concrete Pavement”, Transp. Res. Rec., J. of the TRB,
2235, pp.66–81.
[7]. Hass, R., Hudson, W. R., and Zaniewski, J. (1994).
“Modern pavement management”, Krieger Publishing
Company, Malabar, Florida.
[8]. Hicks, R. G., Seeds, S. B., and Peshkin, D. G. (2000).
“Selecting a Preventive Maintenance Treatment for
Flexible Pavements”, Foundation for Pavement
Preservation, pp.01–43.
[9]. Linard, K. T. (2000). “Application of system dynamics to
st pavement maintenance optimisation”. 1 Inter. Conf. on
Sys. Thinking in Management.
[10]. Morlan, D. A. (2011). “Cost benefit analysis of
including microsurfacing in pavement treatment
strategies and cycle maintenance”, Commonwealth of
Pennsylvania Department of Transportation.
[11]. Ningyuan, L., Kazmierowski. T., Tighe, S., and Hass, R.
(2001). “Integrating dynamic performance prediction
models into pavement management maintenance and
th rehabilitation programs”. 5 Inter. Conf. on Managing
Pavement.
[12]. Peshkin, D., Hoerner, T., and Zimmerman, K. (2004).
“The optimal time for preventive maintenance: concepts
and practice”. 6th International Conference on
Managing Pavements.
[13]. Shahin, M. Y. (2005). “Pavement management for
airports, roads, and parking lots”, Springer Publication,
New York.
[14]. Smadi, O. (2004). “Quantifying the benefit of
th pavement management”, Proc., 6 Inter. Conf. of
Managing Pavement.
[15]. Walls, J., and Smith, M. (1998). “Life-cycle cost
analysis in pavement design–In search of better
investment decisions”, Interim Tech. Bulletin, Publication
No. FHWA-SA-98-079, FHWA, Washington, D.C.
[16]. Zaniewski, J. (1991). “Unified methodology for airport
pavement analysis and design”, State of the Art Tech.
Report, FAA, Research and Development Service,
Washington, D.C., 1, pp.137–150.