Factors Causing Delay in Marine Construction Projects in India

Abhishek Shrivas*, Harish Kumar Singla**
* Assistant Professor, National Institute of Construction Management and Research, Pune, Maharashtra, India.
** Associate Professor, National Institute of Construction Management and Research, Pune, Maharashtra, India.
Periodicity:June - August'2018
DOI : https://doi.org/10.26634/jce.8.3.14035

Abstract

The present study is an attempt to find out the most important factors that affect the time overrun in marine construction projects. Based on the literature review and expert opinion, 18 critical factors that affect the time overrun are identified. An analysis was done using Relative Importance Index (RII) method to find out the ranks of all these factors. Poor project monitoring and lack of defined project management plan are identified as the most critical factors based on RII. Further these 18 factors were categorized into three parts, i.e. planning related, execution related, and general factors and it was found out that planning related factors are more critical, followed by execution and general factors based on average scores using descriptive analysis. However, one way ANOVA results indicated that all three factors are equally important for delay in projects and respondents do not differentiate a great deal between them.

The entire dataset was further investigated to see, if client, contractor and consultant differentiate between planning, execution and general factors. The findings indicate that all three stakeholders consider these factors equally important and do not differentiate between them.

Keywords

Marine, Time Overrun, Cost Overrun, RII, Construction

How to Cite this Article?

Shrivas, A., Singla, H. K. (2018). Factors Causing Delay in Marine Construction Projects in India. i-manager's Journal on Civil Engineering, 8(3), 12-19. https://doi.org/10.26634/jce.8.3.14035

References

[1]. Ali, A. S., Kamaruzzaman, S. N., Sulaiman, R., & Cheong Peng, Y. (2010). Factors affecting housing maintenance cost in Malaysia. Journal of Facilities Management, 8(4), 285-298.
[2]. Alinaitwe, H., Apolot, R., & Tindiwensi, D. (2013). Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), 33-47.
[3]. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357.
[4]. Chitkara, K., K. (2011). Construction Project Management: Planning, Scheduling and Controlling. Tata Mcgraw Hill: India.
[5]. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489.
[6]. Elawi, G. S. A., Algahtany, M., Kashiwagi, D., & Sullivan, K. (2015). Major factors causing construction delays in Mecca. Journal for the Advancement of Performance Information & Value, 7(1), 1-11.
[7]. Emam, H., Farrell, P., & Abdelaal, M. (2015, September). Causes of delay on infrastructure projects in Qatar. In Proceedings of the 31st Annual ARCOM Conference, Lincoln, UK, Association of Researchers in Construction Management, Nottingham, UK (pp. 773-782).
[8]. Honrao, M. Y., & Desai, D. B. (2015). Study of delay in execution of infrastructure projects–highway construction. International Journal of Scientific and Research Publications, 5(6), 1-8.
[9]. Kasimu, M. A. (2012). Significant factors that causes cost overruns in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 3(11), 775-780.
[10]. Memon, A. H., Abdul Rahman, I., & Aziz, A. A. A. (2011). Time overrun in construction projects from the perspective of Project Management Consultant (PMC). Journal of Surveying, Construction and Property, 2(1), 54- 66.
[11]. Morris, P. W., & Hough, G. H. (1987). The Anatomy of Major Projects: A Study of the Reality of Project Management. Wiley.
[12]. Pai, S. K., & Bharath, J. R. (2013). Analysis of critical causes of delays in Indian infrastructure projects. International Journal of Innovative Research and Development, 2(3), 251-263.
[13]. Patil, S. K., Gupta, A. K., Desai, D. B., & Sajane, A. S. (2013). Causes of delay in Indian transportation infrastructure projects. International Journal of Research in Engineering and Technology, 2(11), 71-80.
[14]. Salama, M., El Hamid, M. A., & Keogh, B. (2008, September). Investigating the causes of delay within Oil th and Gas projects in the UAE. In Proceedings of the 24 Annual ARCOM Conference (pp. 819-826).
[15]. Seboru, M. A. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering, 3(3), 51-63.
[16]. Shibani, A., & Sukumar, D. (2015). A role of project manager in construction projects in India. Chinese Business Review, 14(6), 298-324.
[17]. Sumaiyya, N. R., & Khare, P. R. (2015). Sustainable urban transportation system:-A case study of Manpada road. International Journal of Computer Science Trends and Technology, 4(3), 304-308.
[18]. Tam, V. W., & Shen, L. Y. (2012). Risk management for contractors in marine projects. Organization, Technology & Management in Construction: An International Journal, 4(1), 403-410.
If you have access to this article please login to view the article or kindly login to purchase the article

Purchase Instant Access

Single Article

North Americas,UK,
Middle East,Europe
India Rest of world
USD EUR INR USD-ROW
Pdf 35 35 200 20
Online 35 35 200 15
Pdf & Online 35 35 400 25

Options for accessing this content:
  • If you would like institutional access to this content, please recommend the title to your librarian.
    Library Recommendation Form
  • If you already have i-manager's user account: Login above and proceed to purchase the article.
  • New Users: Please register, then proceed to purchase the article.