References
[1]. Ali, A. S., Kamaruzzaman, S. N., Sulaiman, R., & Cheong Peng, Y. (2010). Factors affecting housing maintenance cost in Malaysia. Journal of Facilities Management, 8(4), 285-298.
[2]. Alinaitwe, H., Apolot, R., & Tindiwensi, D. (2013). Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), 33-47.
[3]. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357.
[4]. Chitkara, K., K. (2011). Construction Project Management: Planning, Scheduling and Controlling. Tata Mcgraw Hill: India.
[5]. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489.
[6]. Elawi, G. S. A., Algahtany, M., Kashiwagi, D., & Sullivan, K. (2015). Major factors causing construction delays in Mecca. Journal for the Advancement of Performance Information & Value, 7(1), 1-11.
[7]. Emam, H., Farrell, P., & Abdelaal, M. (2015, September). Causes of delay on infrastructure projects in Qatar. In Proceedings of the 31st Annual ARCOM Conference, Lincoln, UK, Association of Researchers in Construction Management, Nottingham, UK (pp. 773-782).
[8]. Honrao, M. Y., & Desai, D. B. (2015). Study of delay in execution of infrastructure projects–highway construction. International Journal of Scientific and Research Publications, 5(6), 1-8.
[9]. Kasimu, M. A. (2012). Significant factors that causes cost overruns in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 3(11), 775-780.
[10]. Memon, A. H., Abdul Rahman, I., & Aziz, A. A. A. (2011). Time overrun in construction projects from the perspective of Project Management Consultant (PMC). Journal of Surveying, Construction and Property, 2(1), 54- 66.
[11]. Morris, P. W., & Hough, G. H. (1987). The Anatomy of Major Projects: A Study of the Reality of Project Management. Wiley.
[12]. Pai, S. K., & Bharath, J. R. (2013). Analysis of critical causes of delays in Indian infrastructure projects. International Journal of Innovative Research and Development, 2(3), 251-263.
[13]. Patil, S. K., Gupta, A. K., Desai, D. B., & Sajane, A. S. (2013). Causes of delay in Indian transportation infrastructure projects. International Journal of Research in Engineering and Technology, 2(11), 71-80.
[14]. Salama, M., El Hamid, M. A., & Keogh, B. (2008, September). Investigating the causes of delay within Oil th and Gas projects in the UAE. In Proceedings of the 24 Annual ARCOM Conference (pp. 819-826).
[15]. Seboru, M. A. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering, 3(3), 51-63.
[16]. Shibani, A., & Sukumar, D. (2015). A role of project manager in construction projects in India. Chinese Business Review, 14(6), 298-324.
[17]. Sumaiyya, N. R., & Khare, P. R. (2015). Sustainable urban transportation system:-A case study of Manpada road. International Journal of Computer Science Trends and Technology, 4(3), 304-308.
[18]. Tam, V. W., & Shen, L. Y. (2012). Risk management for contractors in marine projects. Organization, Technology & Management in Construction: An International Journal, 4(1), 403-410.