References
[1]. Ardit, D., Messiha, H.M. (1999). Life cycle cost analysis (LCCA) in municipal organizations, Journal of Infrastructure Systems, 5(1), 1-10.
[2]. Asiedu, Y., and Gu, P. (1998). Product life cycle cost analysis: state of the art review, International Journal of Production Research, 36(4), 883-908.
[3]. Byrne, P. (1997). Fuzzy DCF: a contradiction in terms, or a way to better investment appraisal? Paper presented to RICS 'Cutting Edge' Conference, London, 5–6 September.
[4]. Burns, P., Hope, D., and Roorda, J. (1999). Managing infrastructure for the next generation, Automation in Construction, 8, 689-703.
[5]. CIRIA C677 (2009), Whole life Infrastructure asset management: Good Practice Guide for Civil Infrastructure.
[6]. Dornan, D., Bajadek, E.C., and Mac-Nemee, P.(1999). Deferred maintenance pavement performance curve, Understanding GASB 34's Infrastructure Reporting Requirements, a PricewaterhouseCoopers white paper, October 1999.
[7]. Dornan, D.L. (2002). Asset Management - Remedy for addressing the physical challenges facing Highway infrastructure, International Journal of Transport Management, 1, 41-54.
[8]. Edwards, P.J., and Bowen, P.A. (1998). Practices, barriers and benefits of risk management process in building services cost estimation: comment, Construction Management and Economics, 16, 105-8.
[9]. Egan, J. L. (1998), Rethinking construction: The report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the scope for improving the quality and efficiency of UK construction, Report, Department of the Environment, Transport, and the Regions, London.
[10]. EI-Haram, M.A., Marenjak, S., and Homer, M.W. (2002). Development of a generic framework for collecting whole life cost data for the building industry, Journal of Quality in Maintenance Engineering, 8(2), 144-51.
[11]. Emblemsvag, J. (2001). Activity-based life-cycle costing, Managerial Auditing Journal, 16, (1), 17-27.
[12]. Engelhardt, M., Savic, D., Skipworth, P., Cashman, A., Saul, A., and Walters, G. (2003). Whole life costing: application to water distribution network, Water Supply, 3(1-2), 87-93.
[13]. Fabrycky, W.J., and Blanchard, B.S. (1991). Life Cycle Cost and Economic Analysis, Prentice-Hall, Englewood Cliffs, NJ.
[14]. Flanagan, R., Kendell, A., Norman, G. and Robinson, G. (1987). Life cycle costing and risk management, Construction Management and Economics, 5, 53-71.
[15]. Highway Agency Strategic Plan (2010-2015) http://www.highways.gov.uk/aboutus/documents/NPPD_Strategic_Plan_-_Final1.pdf.
[16]. Hudson, R., Ralph, H., and Waheed, U. (1997). Infrastructure Management: Integrating Design, Construction, Maintenance, Rehabilitation, and Renovation. McGraw-Hill, New York.
[17]. Jackson, C.B. (2002). The Changing Face of Continuity Planning, Information Systems Security, 10(6), 18-21.
[18]. Kirkham, R.J., Boussabaine, A.H., and Awwad, B.H. (2002). Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings, Construction Management and Economics, 20, 251-61.
[19]. Kirkham, J.R. (2005). Re-engineering the whole life cycle costing process, Construction Management and Economics, 23, 9-14.
[20]. Kishk, M. (2001). An integrated fuzzy approach to whole-life costing based decision making, unpublished PhD thesis, The Scott Sutherland School, The Robert Gordon University, Aberdeen.
[21]. Kishk, (2004). Combining various facets of uncertainty in whole-life cost modelling, Construction Management and Economics, 22, 429-435.
[22]. Korpi, E., and Ala-Risku, T. (2008). Life cycle costing: a review of published case studies, Managerial Auditing Journal, 23 (3), 240-261.
[23]. Latham, M. (1994), Constructing the Team: Industry Review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry, Final Report of the Government. HMSO, London.
[24]. Lemer, A.C. (1996). Infrastructure obsolescence and design service life, Journal of Infrastructure Systems 2 (4), 153-161.
[25]. Lemer, A.C. (1999). Building public works infrastructure management systems for achieving high return on public assets, Public Works Management and Policy 3 (3), 255–272.
[26]. Lindholm, A., and Suomala, P. (2004). The possibilities of life cycle costing in outsourcing decision making, in Seppa¨, M., Jarvelin, A-M., Kujala, J., Ruohonen, M., Tiainen, T. (Eds), Proceedings of e-Business Research Forum eBRF 2004, Tampere, Finland, 226-241.
[27]. Martin, T., and Roper, R. (1997a.). ARRB Research Report 306 – A Parametric Study of the Influence of Maintenance and Rehabilitation Strategies on Network Life Cycle Costs. ARRB Transport Research Ltd, Victoria, Australia.
[28]. McNeil, S., Tischer, M.L., and DeBlasio, A.J. (2000). Asset Management: What is the Fuss? Transportation Research Record 1729, Transportation Management and Education. Transportation Research Board.
[29]. Meacham, B., Bowen, R., Traw, J. and Moore, A. (2005). Performance-based building regulation: current situation and future needs, Building Research & Information, 33(2), 91–106.
[30]. National Audit Office, (2009), Contracting for Highways Maintenance, Stationery Office, London.
[31]. New Civil Engineer, (2010), http://www.nce.co.uk/ news/transport/highways-agency-announces-reform-of-maintenance-contracts/8609038.article.
[32]. Pasquire, C., and Swaffield, L. (2002). Life-cycle /Whole-life costing, In: Kelly, J., Morledge, R. and Wilkinson, S. (eds.) Best value in construction, Blackwell Sciences, Oxford.
[33]. Publicly Available Specification, (PAS 55-1: 2008), Part 1 Specification for the optimised management of physical assets, BSI, ISBN: 978 0 580 50975 9, UK
[34]. Santora, M., and Rande, W. (2008). Water infrastructure in crisis, Public Management, 90(11). 17-20.
[35]. Shewan E. Kovacs, (1995). Enterprise-wide integrated infrastructure asset management, Public Works, 126 (10), 66–69.
[36]. Straub, A. (2007). Performance-based maintenance partnering: a promising concept, Journal of Facilities Management, 5(2), 129–142.
[37]. Straub, A. (2009). Cost savings from performance based maintenance contracting, International Journal of Strategic Property Management, 13, 205–217.
[38]. Van Mossel, J.H. (2008). The purchasing of maintenance service delivery in the Dutch social housing sector, Optimising commodity strategies for delivering maintenance services to tenants, IOS Press, Amsterdam.
[39]. Woodward, D. (1997). Life cycle costing – theory, information acquisition and application, International Journal of Project Management, 15 (6), 335-44.
[40]. White, G. E., Ostwald, P.F. (1976). Life cycle costing, Management Accounting, 39, (40 & 42).