References
[1]. N.B. Chaphalkar and Sayali S. Sandbhor, (2015).
“Application of Neural Networks in Resolution of Disputes for
Escalation Clause using Neuro-Solutions”. KSCE Journal of
Civil Engineering, Vol. 19, No. 1, pp. 10-16.
[2]. Ibrahim Yitmen and Ebrahim Soujeri, (2010). “An
Artificial Neural Network model for estimating the influence
of change orders on project performance and dispute
resolution”. Proceedings of the International Conference
on Computing in Civil and Building Engineering, Vol. 1.
[3]. S.O. Cheung, C.M. Tam, and F.C. Harris, (2000). “Project
dispute resolution satisfaction classification through neural network”. J. Manage. Eng., Vol. 16, No. 1, pp. 70-79.
[4]. Jui-Sheng Chou and Chieh Lin, (2013). “Predicting
Disputes in Public-Private Partnership Projects: Classification
and Ensemble Models”. J. Computing in Civil Engineering,
Vol. 27, No. 1, pp. 51-60.
[5]. Xinyi Song, S.M., Feniosky Peña-Mora, M., Carol C.
Menassa, M., and Carlos A. Arboleda, (2012). “Insurance
as a Risk Management Tool for ADR Implementation in
Construction Disputes”. J. Constr. Eng. Manage., Vol. 138,
No. 1, pp. 14-21.
[6]. Sai On Cheung, Tak Wing Yiu, and Ho Wai Chan,
(2010). “Withdrawal in Construction Project Dispute
Negotiation”. J. Constr. Eng. Manage., Vol. 137, No. 12, pp.
1071-1079.
[7]. Conor Owens, (2008). “Dispute Resolution in the
Construction Industry in Ireland: A Move to Adjudication”. J.
Prof. Issues Eng. Educ. Pract., Vol. 134, No. 2, pp. 220-223.
[8]. K.W. Chau, (2007). “Insight into resolving Construction
Disputes by Mediation/Adjudication in Hong Kong” J. Prof.
Issues Eng. Educ. Pract., Vol. 133, No. 2, pp.143-147.
[9]. Edwin H. Chan, Henry C. Suen, and Charles K., Chan,
(2006). “MAUT-based Dispute Resolution Selection Model Prototype for International Construction Projects”. J. Constr.
Eng. Manage., Vol. 132, No. 5, pp. 444-451.
[10]. Edwin H.W. Chan and Henry C.H. Suen, (2005).
“Disputes and Dispute Resolution Systems in Sino-Foreign
Joint Venture Construction Projects in China”. J. Prof. Issues
Eng. Educ. Pract,. Vol. 131, No. 2, pp. 141-148.
[11]. Robert A. Rubin, F., and Bettina V. Quintas, (2003).
“Alternative Dispute Resolution in U.S. Public Works: Proposed
Model”. J. Prof. Issues Eng. Educ. Pract,. Vol. 129, No. 2, pp.
80-83.
[12]. Sai-On Cheung, Henry C.H. Suen, and Tsun-Ip Lam
(2002). “Fundamentals of Alternative Dispute Resolution
Processes in Construction”. J. Constr. Eng. Manage., Vol.
128, No. 5, pp. 409-417.
[13]. Panagiotis Mitropoulos and Gregory Howell, (2001).
“Model for Understanding, Preventing, and Resolving
Project Disputes”. J. Constr. Eng. Manage., Vol.127, No. 3,
pp. 223-231.
[14]. Kwok-Wing Chau, (1992). “Resolving Construction
Disputes By Mediation: Hong Kong Experience”. J.
Manage. Eng., Vol. 8, No. 4, pp. 384-393.